TY - JOUR
T1 - A review of flexible job shop scheduling problems considering transportation vehicles
AU - Xin, Bin
AU - Lu, Sai
AU - Wang, Qing
AU - Deng, Fang
N1 - Publisher Copyright:
© Zhejiang University Press 2025.
PY - 2025/3
Y1 - 2025/3
N2 - The flexible job shop scheduling problem for processing machines and transportation vehicles (FJSP_PT) has garnered significant attention from academia and industry. Due to the inclusion of transportation vehicle scheduling in the scheduling problem of flexible manufacturing systems, solving FJSP_PT becomes more challenging and significantly more practically relevant compared to the flexible job shop scheduling problem. We summarize the assumptions, constraints, objective functions, and benchmarks of FJSP_PT. Then, statistical analysis is conducted on the literature up to 2023, including journals, number of articles published each year, and solution algorithms. We analyze recent literature on FJSP_PT, categorizing it based on algorithms into exact algorithms, heuristic algorithms, meta-heuristic algorithms, and swarm intelligence based algorithms. Finally, the research trends and challenges faced by FJSP_PT are summarized.
AB - The flexible job shop scheduling problem for processing machines and transportation vehicles (FJSP_PT) has garnered significant attention from academia and industry. Due to the inclusion of transportation vehicle scheduling in the scheduling problem of flexible manufacturing systems, solving FJSP_PT becomes more challenging and significantly more practically relevant compared to the flexible job shop scheduling problem. We summarize the assumptions, constraints, objective functions, and benchmarks of FJSP_PT. Then, statistical analysis is conducted on the literature up to 2023, including journals, number of articles published each year, and solution algorithms. We analyze recent literature on FJSP_PT, categorizing it based on algorithms into exact algorithms, heuristic algorithms, meta-heuristic algorithms, and swarm intelligence based algorithms. Finally, the research trends and challenges faced by FJSP_PT are summarized.
KW - Flexible manufacturing system
KW - Integrated scheduling
KW - Processing machine
KW - TP273
KW - Transportation vehicle
UR - http://www.scopus.com/pages/publications/105002920123
U2 - 10.1631/FITEE.2300795
DO - 10.1631/FITEE.2300795
M3 - Review article
AN - SCOPUS:105002920123
SN - 2095-9184
VL - 26
SP - 332
EP - 353
JO - Frontiers of Information Technology and Electronic Engineering
JF - Frontiers of Information Technology and Electronic Engineering
IS - 3
ER -